Altera ALTDQ_DQS2 Manual do Utilizador Página 83

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 100
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 82
8. To view the simulation results, on the Tools menu, select Run Simulation Tool and then click RTL
Simulation.
For a successful simulation, you may need to manually change alterapll.vo to alterapll.v in the auto-
generated top_run_msim_rtl_verilog.do file.
9. Before running the Fitter, ensure that the following settings are done in the Assignment Editor.
I/O Standard
Input Termination
Output Termination
DQ Group
Location assignment for strobe pin—this helps the Fitter to fit the related DQ pins in the
appropriate l/O sub-banks. You can then back-annotate the locations if desired.
The following figure shows an example setting in the Assignment Editor and the Pin Planner results:
Figure 53: Assignment Editor Window
UG-01089
2014.12.17
Setting Up NativeLink and Simulation Settings
83
ALTDQ_DQS2 IP Core User Guide
Altera Corporation
Send Feedback
Vista de página 82
1 2 ... 78 79 80 81 82 83 84 85 86 87 88 ... 99 100

Comentários a estes Manuais

Sem comentários