
5–4 Chapter 5: Board Test System
Using the Board Test System
MAX V CPLD Development Kit User Guide January 2011 Altera Corporation
The Power Tab
The Power tab allows you to measure estimated power consumption for the MAX V
through test points available on the development board, as specified by the BTS
General design you choose from the Config menu (Figure 5–1).
f For more information on the location of the test points and details on MAX V rail
voltage, refer to the MAX V CPLD Development Board Reference Manual.
Figure 5–3 shows the Power tab.
1 Follow the on-screen instructions for the measurement steps.
Figure 5–3. The Power Tab
Comentários a estes Manuais